Economic Recyclable PP Hollow Concrete Formwork Extrusion Machine
PP concrete formwork trendency
Nowadays in 21st century, a successful industry relies more and
more on the feasibility of sustainable solution, which means lower
in cost and
friendly to environment. Among many of the current formworks, PP
hollow construction formwork draws much more attention among the
construction
engineers and related users and busniness man due to the low cost
and environment contribution.
Although in some places, project team get used to the traditional
formwork such as formworks of wood, bamboo, aluminum, and PVC
sheet, the market for formwork is undergoing great innovation by
replacement of a new formwork call PP Hollow Construction Formwork
of high strength,light weight, short project time and lower price
which greatly satisfied the businessman, meantime, in considering
that the contruction consumes plenty of timber resoucres which are
not recyclable, the government advocates more to use pp formwork in
construction biulding.
At the same time, the project team also find it easy and happy to
use this new formwork, beacause it is easy to maintain and handle
in practise, for the same project they do the less work.
For the reason above, the new formworks are in great demand, so
here comes the great chance to produce and sell this new formwork,
we have the formular, and we have the mechanic engineers and
production experiences, in machines and production we are experts.

PP formwork sheet production flowchart

Production line machine list and engeering drawing

PP construction formwork sheet advantage
1,Due to its smooth surface, it is easy to demould even after 20 or
30 times more without release agent.
2,Easy to handle and transport due to light weight which is between
7 and 11 kg/m2.
3,It has a stable performance in weather exposure, it can work
without deformation and swelling between -20℃ and +60℃, and is also
resistant to acid ,alkali and water.
4,Easy to maintain and clean, after demoulding, highpressure water
can be used for surface cleaning.
5,Reuse is applicable to reduce the cost in construction formwork,
for example the formwork for concrete wall and slab can be reused
for 30 times more,
and the formwork for concrete beam,pillar and colum can be reused
for 40 times more.
6,It makes construction project time shorter and less consumption
for formwork, for example, for a 35-floor building, we only need to
prepare formwork for 3 or 4 floors' scale.
7,Finally, the waste or damaged sheet can be crushed into flakes to
feed the production of pp formwork again.
PP Hollow Construction formwork comparing to others
Item compared | PP hollow formwork sheet | PVC sandwich formwork sheet | Wood formwork sheet | Aluminum formwork sheet | Bamboo plywood sheet |
Unit Price CNY/m2 | 60 | 75 | 35 | 800 | 39 |
Recycling times | 50-100 | 20-30 | 4-6 | 80-100 | 8-10 |
10m Fall off test | No deformation | No deformation | Cracked | Deformed | Slightly cracked |
Anti-abrasion | Yes | Yes | No | Yes | No |
Shape after water absorption | Remain same | Remain same | Transformed | Remain same | Transformed |
Demould | Easy | Easy | Hard | Hard | Hard |
Nail stapling | Easy | Hard | Easy | Can not | Easy |
Swelling and shrinkage | Slightly | Depending on temperature | Slightly | Slightly | Slightly |
Eco-friendly | Recyclable | Recyclable | Nearly non-recyclable,consumption more timber resources | Recyclable | Nearly non-recyclable,consumption more timber resources |
Weight kg/m2 | 7 | 13 | 7.2 | 25 | 6.5 |
Project time | Short | Longer | Short | Long | Short |
Wasted Price | 30 | 18 | 1 | 200 | 3 |
Cost in average | 1.2 | 2.8 | 5.6 | 6.0 | 3.2 |
After-Sales Policy
1 Technical documents
All the symbols on the equipments should be in English. Seller is
responsible to provide general layout plan, electric plan,
installation direction, and manual book in English to Buyer on
time.
2. Arrangement for inspection, installation and testing work
a. After all machines are delivered to customer's factory; Buyer is
responsible for all preparation work, e.g. electricity supply,
water supply, labors and cranes, etc.
b. ACEMIEN will prepare for visa application for their engineers,
who are responsible for guide of machine installation and testing
at the Buyer's factory.
c. The Buyer will buy the round-trip air ticket for Engineer if
visa application is approved. The buyer is also responsible to bear
expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 per day for each engineer.
d. Engineer will give free training lessons to labors in buyer's
factory.
e. If buyer doesn't request installation and commissioning by
Seller's engineer in 4 months since date of bill of lading, which
to be accounted all the machines has been successfully tested by
buyer.
3. Quantity and quality guarantee
a. Quantity/Quality Discrepancy to destination port during
transportation:
In case of quality/quantity discrepancy to destination port in
transportation, customer should file claim within 30 days after the
arrival of the goods at port of destination. Insurance company and
shipping company will be responsible for any discrepancy of the
goods caused by shipping company and other transportation
organization and/or post office.
b. Guarantee period and after-sales services: 12 months since date of bill of lading
During this guarantee period, ACEMIEN will provide spare parts
without any charge in case of quality discrepancy caused by us. If
the malfunctions are caused by your incorrect operations, ACEMIEN
will provide the buyer spare parts at cost price.
c. Long-term service:
ACEMIEN will charge the buyer cost price of spare parts beyond one
year and provide long-term technical guide.